Completed

amex-thmb.png


American Express Centurion Lounge

Nicholson Corporation was selected by Holt Construction to complete the work for American Express Centurion Lounge at JFK International Airport. At 15,000 SF, this lounge is the largest in Amex’s global network, featuring a 2-story elevated lounge space and a mechanical penthouse located south of the existing terminal. The lounge will also include a member service area, back-of-house kitchen, family room and a bar installation with a seating area. Nicholson Corporation was responsible for the Millwork, Drywall, Ceilings, Doors, and Hardware throughout the massive world-class lounge.

American Express SVP, Global Loyalty & Benefits Chris Cracchiolo commented: “As a major gateway for both domestic and international travel, we’re thrilled to soon provide our card members with a premium lounge experience in Terminal 4, one of the most active air terminals in the country.”

Location
JFK Int’l Airport – Terminal 4

Year
2020

GC:
Holt

Status
Completed



kenn-gallery1-1280x854.jpg


Latest Project

Jefferson Kennedy Hospital


Nicholson Corporation was selected to complete the work for the 8 story addition to Jefferson Kennedy Hospital in Cherry Hill, NJ with General Contractor LF Driscoll. In addition to completing the Cold Form Metal Framing for the exterior of the building, we also installed all interior framing, drywall, ceilings, doors, and wall protections throughout the facility. These additions by Nicholson Corporation will allow the hospital to provide better emergency care thanks to added patient rooms, new radiology department, operating suites, green roof, and heliport.

Location
Cherry Hill, NJ

Year
2020

GC:
LF Driscoll

Status
Completed




unilever_dw2i0975a.jpg


Unilever US Headquarters


We were selected by Structure Tone complete the drywall, carpentry, and ceilings for the renovation of Unilever’s US Headquarters in 2018. Nicholson assisted with the massive renovation project to transform five 1960s office buildings into a single state-of-the-art workplace.

Unilever received LEED® Platinum certification from the U.S. Green Building Council (USGBC), the highest level available for sustainable buildings. The revamped campus includes design features such as daylighting, greenhouse gas reductions, circadian lighting, biophilic elements, integrated smart technologies, and water efficiency systems.

In an unprecedented example of green redevelopment, Unilever reduced its carbon dioxide emissions by 50 percent, potable water demand by 50 percent, and total energy consumption by 50 percent — all while providing 28 percent more useable space and accommodating all 1,700 employees.

Nicholson Corporation is proud to have played a role in what was one of the healthiest, most sustainable, and most technologically advanced redevelopments in the New York metropolitan area.

Location
Englewood Cliffs, NJ

Year
2018

GC:
Structure Tone

Status
Completed


4-1-1280x960.jpg


American Water Headquarters


Nicholson Corporation completed the carpentry, drywall, and ceilings throughout the American Water Headquarters in Camden, NJ. The 220,000 SF facility, which opened in December 2018, was part of a $1 billion mixed-use development initiative known as The Camden Waterfront.

The five-story LEED® Platinum building features a grand atrium, specialty wood ceilings, LED lighting, green roofs, high-efficiency HVAC and glass systems, and an extensive water reuse system. The fine craftsmanship provided by Nicholson is seen throughout multiple offices, conference rooms, and co-working spaces at the elegant waterfront headquarters.

Location
Camden, NJ

Year
2018

GC:
L.F. Driscoll / Jingoli JV

Status
Completed


Air-Canada-POST1-1280x824.jpg


Air Canada Maple Leaf Lounge



We worked with Holt Construction to complete the carpentry and millwork for the Air Canada Maple Leaf Lounge at LaGuardia Airport. Finished in 2018, the elegant 7,000 SF lounge features a self-serve bar, business center, and comfortable seating with a view of the tarmac.

Nicholson Corporation executed the carpentry & millwork for the reception desk, entrance, seating and dining areas, slot dividing wall, kitchen, and restrooms. Another job well done by the Nicholson team!

Location
Queens, NY

Year
2018

GC: 
Holt Construction

Status
Completed


LG-Headquarters-NJ-Exterior-Aerial-1900.jpg


LG North America Corporate Headquarters


We worked with Turner Construction on LG’s new North American headquarters. This stunning building, settled atop the steep cliffs of the Palisades in Englewood Cliffs, New Jersey, is LEED Platinum certified and includes energy efficient building systems, green roofs, solar panels and more. Nicholson Corporation applied our expertise to complete the carpentry, drywall, ceilings and masonry in accordance with the meticulously planned and future-forward design of this building.

Location
Englewood Cliffs, NJ

Year
2019

GC:
Turner Construction

Status
Completed


jc-thmb.jpg


Hyatt House Jersey City


Nicholson Corporation was selected by HSC to complete the work for the 2nd Floor upgrades to the Hyatt House in Jersey City, NJ. In addition to the demolition and removal of existing features throughout the 2nd Floor, we also installed drywall, interior framing, and ceilings.. These additions by Nicholson Corporation refreshed the entire 2nd Floor to match the elegance of the exquisite waterfront hotel.

Location
Jersey City, NJ

Year
2017

GC:
HSC

Status
Completed


SLC-thmb.jpg


Montefiore St. Luke’s Cornwall Hospital



Agility, quality, and precision. Three values that make Nicholson a leader for healthcare projects. Sixteen weeks from contract to punch list – our team delivers. Shop drawings were being reviewed 2 weeks from contract and FSC material take off was initiated simultaneously so ensure proper LEED compliance was met.

Acquisition of long lead materials and submittal review process is effortless for the experienced Nicholson millwork team. We thrive through strong starts, strong follow throughs, and a strong finish.

Holt Construction selected Nicholson Corporation to complete the millwork for the renovations at St. Luke’s Hospital at their Cornwall Campus in December 2020.

Location
Cornwall, NY

Year
2020

GC: 
Holt Construction

Status
Completed


brl-thmb.jpg


Burlington Coat Factory Headquarters



Barr & Barr selected Nicholson Corporation to complete the drywall work for Burlington Coat Factory’s headquarters in North Burlington, NJ. We were thrilled to take on this ambitious and innovative project. The headquarters contain a mix of sleek, sophisticated architecture, a stunning glass window exterior, vivid lighting, and a fun and fresh color scheme. The drywall we implemented needed to be both architecturally sound and visually appealing, adding to the clean and modern look of the new building.

Location
North Burlington, NJ

Year
2014

GC: 
Barr & Barr

Status
Completed