Finished Carpentry

unilever_dw2i0975a.jpg


Unilever US Headquarters


We were selected by Structure Tone complete the drywall, carpentry, and ceilings for the renovation of Unilever’s US Headquarters in 2018. Nicholson assisted with the massive renovation project to transform five 1960s office buildings into a single state-of-the-art workplace.

Unilever received LEED® Platinum certification from the U.S. Green Building Council (USGBC), the highest level available for sustainable buildings. The revamped campus includes design features such as daylighting, greenhouse gas reductions, circadian lighting, biophilic elements, integrated smart technologies, and water efficiency systems.

In an unprecedented example of green redevelopment, Unilever reduced its carbon dioxide emissions by 50 percent, potable water demand by 50 percent, and total energy consumption by 50 percent — all while providing 28 percent more useable space and accommodating all 1,700 employees.

Nicholson Corporation is proud to have played a role in what was one of the healthiest, most sustainable, and most technologically advanced redevelopments in the New York metropolitan area.

Location
Englewood Cliffs, NJ

Year
2018

GC:
Structure Tone

Status
Completed


4-1-1280x960.jpg


American Water Headquarters


Nicholson Corporation completed the carpentry, drywall, and ceilings throughout the American Water Headquarters in Camden, NJ. The 220,000 SF facility, which opened in December 2018, was part of a $1 billion mixed-use development initiative known as The Camden Waterfront.

The five-story LEED® Platinum building features a grand atrium, specialty wood ceilings, LED lighting, green roofs, high-efficiency HVAC and glass systems, and an extensive water reuse system. The fine craftsmanship provided by Nicholson is seen throughout multiple offices, conference rooms, and co-working spaces at the elegant waterfront headquarters.

Location
Camden, NJ

Year
2018

GC:
L.F. Driscoll / Jingoli JV

Status
Completed


Air-Canada-POST1-1280x824.jpg


Air Canada Maple Leaf Lounge



We worked with Holt Construction to complete the carpentry and millwork for the Air Canada Maple Leaf Lounge at LaGuardia Airport. Finished in 2018, the elegant 7,000 SF lounge features a self-serve bar, business center, and comfortable seating with a view of the tarmac.

Nicholson Corporation executed the carpentry & millwork for the reception desk, entrance, seating and dining areas, slot dividing wall, kitchen, and restrooms. Another job well done by the Nicholson team!

Location
Queens, NY

Year
2018

GC: 
Holt Construction

Status
Completed


LG-Headquarters-NJ-Exterior-Aerial-1900.jpg


LG North America Corporate Headquarters


We worked with Turner Construction on LG’s new North American headquarters. This stunning building, settled atop the steep cliffs of the Palisades in Englewood Cliffs, New Jersey, is LEED Platinum certified and includes energy efficient building systems, green roofs, solar panels and more. Nicholson Corporation applied our expertise to complete the carpentry, drywall, ceilings and masonry in accordance with the meticulously planned and future-forward design of this building.

Location
Englewood Cliffs, NJ

Year
2019

GC:
Turner Construction

Status
Completed


verizon-thmb.jpg


Verizon Corporate Headquarters


Nicholson Corporation was selected by GC Tishman to complete the work for the Verizon Corporate Headquarters in Basking Ridge, NJ. The construction of their corporate office space was spearheaded by Nicholson Corporation’s expertise in drywall, millwork, and finished carpentry. Our skill team of laborers and craftsmen worked diligently to ensure that each phases of the project exceeded quality and timeliness expectations.

Location
Basking Ridge, NJ

Year
2017

GC:
Aecom Tishman

Status
Completed


ets-thmb.png


Educational Testing Services (ETS)



We worked with Torcon on Educational Testing Services’ new corporate office building in Princeton, NJ. We completed the carpentry, architectural woodwork, doors and hardware, drywall and ceilings for this project. Nicholson Corporation’s expertise in a wide variety of key trades was a unique asset in the construction of this facility, which features a glass atrium, open offices, raised-flooring and sustainable design.

Location
Princeton, NJ

Year
2014

GC:
Torcon

Status
Completed