Sitework

DJI_0094-1280x960.jpg


Richmond University Medical Center



We are working with LF Driscoll on the new emergency department at Richmond University Medical Center on Staten Island. This is our largest civil project to date. We are performing excavation of the site, digging utilities, paving, performing concrete work, and building a retaining wall. This facility will be 35,000 square feet and will allow the hospital to provide better emergency care thanks to expanded operating suites, enhanced energy infrastructure, trauma bays and specialty areas.

Location
Staten Island, NY

Year
2020

GC:
LF Driscoll

Status
In Progress




DJI_0035thmb-1280x721.jpg


Overlook Medical Center




The new 7-story parking garage at Overlook Medical Center is nearing the final phases of construction. When this project began in 2020, Nicholson Corporation was responsible for the removal of over 4,000 cubic yards of rock without blasting. Located in the Watchung mountainside of Summit, NJ, this site included some of the hardest rock in state. Our sitework crew met the challenge by drilling and hammering to get the job done.

A few weeks ago, all 621 precast pieces were carefully hoisted into place. Currently, the garage stands nearly 100 feet tall and will be able to accommodate an additional 650 parking spaces for the hospital.

Our dedicated team is working efficiently to complete the grading and concrete work. Next, the drainage will be completed, along with building the modular block walls, paving, and striping.

As Nicholson delivers this project with accuracy and timeliness, stay tuned for updates of the completion in Spring 2021.



Location
Summit, NJ

Year
2020

GC:
Holt Construction

Status
In Progress





asco-thmb.jpg


ASCO Power Technologies


Nicholson Corporation was selected to complete the concrete and sitework for the ASCO Power Technologies Headquarters in Florham Park, NJ with General Contractor Turner. We were responsible for the excavation and installation of the framing and concrete shown in the photos.

Location
Florham Park, NJ

Year
2016

GC:
Turner

Status
Completed


nit-thmb.jpg


NJIT Wellness & Events Center


Nicholson Corporation was selected by Torcon to complete the cold formed metal framing for the new Wellness & Events Center at NJIT in Newark, NJ. Finished in 2017, the 220,000-square-foot building provides flexible program spaces, promotes the health and well-being of NJIT students, and deliver training facilities that will enhance the development of their Division I student-athletes.

Location
Newark, NJ

Year
2017

GC:
Torcon

Status
Completed


aa-thmb.jpg


LaGaurdia Hangar Relocation


Nicholson Corporation was selected by Holt Construction to complete the sitework, CFMF, concrete, and masonry for the LaGaurdia International Airport American Airlines Hangar 5 Relocation project. In addition to completing the excavation and sitework shown here, we were also selected to install the drywall, acoustical ceilings, millwork, doors and hardware throughout the new hangar. This project will soon be completed.

Location
Queens, NY

Year
2020

GC:
Holt Construction

Status
In Progress


merck-thmb.jpg


Merck – Branchburg


Nicholson Corporation was selected to complete the sitework, concrete, masonry, and paving for the Merck location in Branchburg, NJ. The GC for this job was Structure Tone. Nicholson has executed numerous projects for Merck over our decades serving the construction industry throughout New Jersey and beyond.

Location
Branchburg, NJ

Year
2014

GC:
Structure Tone

Status
Completed


JSUMC-thmb.jpg


Jersey Shore University Medical Center


Nicholson Corporation was selected to complete the work for the Jersey Shore University Medical Center in Neptune, NJ with General Contractor LF Driscoll. In addition to completing the parking lot resurfacing, Route 33 traffic improvements, parking garage additions, and general paving, Nicholson has executed numerous interior projects as well at this job site. We’ve installed drywall and millwork in their labs & hybrid areas, along with fit-outs for their MRI rooms and special purpose rooms throughout the iconic Hope Tower.

Location
Neptune, NJ

Year
2017

GC:
LF Driscoll

Status
Completed


njeda-thmb.jpg


NJ EDA Parking Lot Construction



NJ EDA chose Nicholson Corporation to construct a parking lot for their Merial Tech Center in New Brunswick, NJ. We cleared and graded undeveloped land to construct a vehicle parking area. The elevation of the parking area had to be raised approximately 2’6” to accommodate for the new buildings footprint. This required us to import approximately 3,000 cubic yards of material. Along with the parking lot addition we constructed new concrete curbs, concrete sidewalks, an underground storm water management system, landscaping and lawn restoration.

Location
New Brunswick, NJ

Year
2014

Status
Completed